{"id":1554,"date":"2026-01-20T17:43:09","date_gmt":"2026-01-20T17:43:09","guid":{"rendered":"https:\/\/malaysian-business.com\/wptest\/2026\/01\/20\/ijm-wins-rm1-12-billion-lrt3-underground-package-contract\/"},"modified":"2026-01-23T18:19:42","modified_gmt":"2026-01-23T18:19:42","slug":"ijm-wins-rm1-12-billion-lrt3-underground-package-contract","status":"publish","type":"post","link":"https:\/\/malaysian-business.com\/portal\/2026\/01\/20\/ijm-wins-rm1-12-billion-lrt3-underground-package-contract\/","title":{"rendered":"IJM wins RM1.12 billion LRT3 underground package contract"},"content":{"rendered":"<p>IJM Corporation Bhd (IJM), has been awarded a major RM1.12 billion contract by Prasarana Malaysia Bhd for the Light Rail Transit Line 3 (LRT 3) project from Bandar Utama to Johan Setia, its first construction contract win for 2018.<\/p>\n<p>IJM will deliver the design, construction and completion of the twin-bored tunnels, a station, ancillary buildings and other associated works for the underground package for the LRT 3.\u00a0<\/p>\n<p>The contract requires the use of tunnel boring machines to excavate the 2.1 km underground tunnels with an outer diameter of 6.35 metres, confirming IJM\u2019s expertise in large-scale underground tunnelling and strategic complex infrastructure projects.<\/p>\n<p>The project is scheduled to commence this month, with a construction period of 31 months.<\/p>\n<p>The total contract value of RM1.12 billion has boosted the Group\u2019s outstanding order book to a record, all-time high of RM9.7 billion.<\/p>\n<p>The project is expected to contribute positively to the group\u2019s earnings for the financial year ending 31 March 2019 (FY19) onwards.<\/p>\n<p>\u201cWe are proud to be bringing our tunneling expertise to the construction of the tunnel section for LRT 3 \u2013 an undertaking that further demonstrates our ability to carry out technically complex and large-scale urban infrastructure projects,\u201d said Datuk Soam Heng Choon, CEO &amp; Managing Director, IJM Corporation Berhad.<\/p>\n<p>\u201cIJM has a solid reputation of delivering high standards of quality and performance in project management, design and construction. This project is a continuation of our involvement in major rail transportation networks in the Klang Valley which encompasses infrastructure for LRT, KTM, mass rapid transit (MRT) and monorail projects,\u201d\u2019 Soam added.<\/p>\n<p>Specifically, in the area of railway-related and elevated viaduct projects, IJM brings vast expertise and experience in undertaking and completing numerous projects both locally and internationally. In urban rail, IJM is currently undertaking the Klang Valley Mass Rapid Transit (KVMRT) 2 project for Package V203 viaducts from Jinjang to Jalan Ipoh North Portal and four stations on Package S203.\u00a0<\/p>\n<p>In 2017, IJM successfully completed 5.5 km of elevated viaduct and four stations in Cheras for KVMRT. IJM has also completed works for both the Light Rail Transit LRT1 and LRT2 projects in Kuala Lumpur for STAR LRT and PUTRA (22 km) respectively.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>IJM Corporation Bhd (IJM), has been awarded a major RM1.12 billion contract by Prasarana Malaysia Bhd for the Light Rail Transit Line 3 (LRT 3) project from Bandar Utama to Johan Setia, its first construction contract win for 2018. IJM will deliver the design, construction and completion of the twin-bored tunnels, a station, ancillary buildings [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-1554","post","type-post","status-publish","format-standard","hentry","category-corporate"],"_links":{"self":[{"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/posts\/1554","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/comments?post=1554"}],"version-history":[{"count":1,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/posts\/1554\/revisions"}],"predecessor-version":[{"id":6107,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/posts\/1554\/revisions\/6107"}],"wp:attachment":[{"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/media?parent=1554"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/categories?post=1554"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/tags?post=1554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}