{"id":6743,"date":"2026-02-10T11:44:40","date_gmt":"2026-02-10T11:44:40","guid":{"rendered":"https:\/\/malaysian-business.com\/wptest\/?p=6743"},"modified":"2026-02-10T11:44:40","modified_gmt":"2026-02-10T11:44:40","slug":"progressture-solar-appointed-as-epcc-and-om-contractor-for-hibiscus-petroleums-12-mwp-utility-scale-solar-project-in-brunei-darussalam","status":"publish","type":"post","link":"https:\/\/malaysian-business.com\/portal\/2026\/02\/10\/progressture-solar-appointed-as-epcc-and-om-contractor-for-hibiscus-petroleums-12-mwp-utility-scale-solar-project-in-brunei-darussalam\/","title":{"rendered":"Progressture Solar Appointed as EPCC and O&amp;M Contractor for Hibiscus Petroleum\u2019s 12 MWp Utility-Scale Solar Project in Brunei Darussalam"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p><strong>BRUNEI DARUSSALAM \u2013&nbsp;<\/strong>Progressture Power (B) Sdn Bhd (\u201cProgressture Solar\u201d) has been appointed as the Engineering, Procurement, Construction, Commissioning, and Operations &amp; Maintenance (EPCC &amp; O&amp;M) contractor for a 12 MWp utility-scale solar project developed by Hibiscus Petroleum Berhad in Brunei Darussalam.<\/p>\n\n\n\n<p>Under the appointment, Progressture Solar is responsible for the end-to-end delivery and long-term operation of the solar power plant. The facility will supply clean electricity to Hibiscus\u2019 onshore processing plant in Brunei, enabling the integration of low-carbon energy into a high-load, energy-intensive industrial operation.<\/p>\n\n\n\n<p>As part of the project\u2019s ongoing progress, a groundbreaking ceremony was held at the project site within the Sungai Liang Industrial Park (SPARK), Mukim Liang, Kuala Belait, marking a critical milestone. The ceremony brought together representatives from government agencies, project stakeholders, partners, and industry leaders, highlighting continued collaboration in advancing Brunei\u2019s energy diversification and sustainability efforts.<\/p>\n\n\n\n<p>Beyond delivery, Progressture Solar\u2019s long-term operational role will ensure system performance, reliability, and asset longevity throughout the plant\u2019s operational life. This end-to-end responsibility reflects the company\u2019s focus on lifecycle delivery and sustained performance for complex, energy-intensive industrial environments.<\/p>\n\n\n\n<p>The project marks Progressture Solar\u2019s first international utility-scale solar project and a significant milestone in the company\u2019s regional expansion beyond Malaysia. The company views this project as the foundation of a long-term presence in Brunei, with further collaborations and renewable energy developments planned in the market.<\/p>\n\n\n\n<p>Cliff Siaw Sze Hau, CEO of Progressture Solar, said:<\/p>\n\n\n\n<p><em>\u201cWe are honoured to be entrusted with both the delivery and long-term operations of this project. Our focus is on disciplined execution, quality, and reliability, ensuring the plant performs to the highest standards throughout its operational life. We see this project as an important step in supporting the continued deployment of utility-scale solar across Malaysia, Brunei and the wider region.\u201d<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BRUNEI DARUSSALAM \u2013&nbsp;Progressture Power (B) Sdn Bhd (\u201cProgressture Solar\u201d) has been appointed as the Engineering, Procurement, Construction, Commissioning, and Operations &amp; Maintenance (EPCC &amp; O&amp;M) contractor for a 12 MWp utility-scale solar project developed by Hibiscus Petroleum Berhad in Brunei Darussalam. Under the appointment, Progressture Solar is responsible for the end-to-end delivery and long-term operation [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":6744,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24,34],"tags":[60,59],"class_list":["post-6743","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-general","tag-brunei","tag-solar"],"_links":{"self":[{"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/posts\/6743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/comments?post=6743"}],"version-history":[{"count":1,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/posts\/6743\/revisions"}],"predecessor-version":[{"id":6745,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/posts\/6743\/revisions\/6745"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/media\/6744"}],"wp:attachment":[{"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/media?parent=6743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/categories?post=6743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/malaysian-business.com\/portal\/wp-json\/wp\/v2\/tags?post=6743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}